Dishwasher Tub Assembly Equipment
For Dishwashers with a Plastic Base
Equipment for dishwasher tub assembly, covering panel bending, bracket and frame joining, adhesive application, spot welding, and sealing-frame trimming.
The equipment scope includes six newly built machines and three modifications to existing machines. Existing sealing-frame forming and tub-baking facilities are used alongside the specified equipment.
Equipment Scope
The equipment scope consists of nine items: six newly built machines and three existing-machine modifications. One set is specified for each item.
Newly Built Equipment
- Center Panel Bending Machine
- Back Panel Bracket Joining Machine
- Automatic Back Panel Adhesive Application Machine
- Upper Front Crossmember and Side Reinforcement Frame Joining Machine
- Back Panel Spot Welding Machine
- Sealing Frame Trimming Machine
Existing-Machine Modifications
- Center Panel Bracket Joining Machine
- Sealing Frame-to-Tub Joining Machine
- Reinforcement Frame-to-Tub Joining Machine
The modified machines are specified to accommodate new and existing product models through tooling changes and equipment parameter adjustments.
From Panel Preparation to Tub Assembly
Key Processing Requirements
Center Panel Bending
The center-panel bending machine forms two rounded corners on the center panel.
The machine uses positioning, pressing, and bending mechanisms, with automatic outfeed after bending.
MATERIAL:
0.4 mm SUS430/BA
SPECIFIED CYCLE TIME:
≤40 s/piece
Back Panel Adhesive Application
The automatic adhesive application machine uses a two-component adhesive supply system.
The adhesive application unit operates along a defined path on the back panel. A manual adhesive gun is also provided for touch-up application.
ADHESIVE SUPPLY:
Two-component system
SPECIFIED CYCLE TIME:
≤60 s/piece
Sealing Frame Trimming
The trimming machine removes excess material from the formed sealing frame.
The cutting mechanism uses hydraulic or pneumatic actuation with a cutting blade. The specified process allows cutting in two operations.
MATERIAL:
0.4 mm SUS430/BA
SPECIFIED CYCLE TIME:
≤20 s/piece
Technical Specifications
The following specifications apply to the equipment scope described above.
Production and Quality Requirements
| Parameter | Specification |
|---|---|
| General Equipment Cycle Time | ≤60 s/piece |
| Center Panel Bending Cycle Time | ≤40 s/piece |
| Sealing Frame Trimming Cycle Time | ≤20 s/piece |
| Overall Qualified Product Rate | ≥98%, excluding material-related causes |
| Specified Individual Station Qualified Rate | ≥99% for the applicable stations |
Operating Requirements
| Parameter | Specification |
|---|---|
| Application | Dishwasher tub assembly for plastic-base models |
| Average Daily Production Operation | 12 hours |
| Electrical Supply | AC 380 V ±10%, 50 Hz |
| Electrical System | Three-phase, five-wire |
| Compressed Air | 0.5–0.7 MPa |
| Air Quality | Dry compressed air |
Operation, Quality and Safety
Loading and Operation
Each machine is specified for one operator.
Parts are manually loaded and removed, while positioning, clamping, and the corresponding processing operations are performed by the equipment.
The center-panel bending machine automatically transfers the processed panel to the unloading position.
Process Quality
The equipment is required to maintain flat workpiece surfaces without cracks, wrinkles, scratches, or deformation defects.
Joining points must meet the specified requirements for dimensions, positioning, and joint strength.
The back-panel spot-welding machine uses a medium-frequency inverter DC welding power supply.
Safety Provisions
The specified safety provisions include two-hand operation controls, emergency-stop buttons, perimeter guarding, safety light curtains, and safety alarms.
These measures are incorporated into the equipment operating and access arrangements.
Delivery and Technical Support
Installation & Commissioning
Equipment installation and commissioning are included in the specified scope.
Technical Documentation
Equipment layout drawings, electrical and pneumatic documentation, operating manuals, maintenance manuals, and related technical records are provided as specified.
Control Programs
PLC and HMI programs are included in the specified technical documentation.
Warranty
A warranty period of not less than 12 months is specified from final equipment acceptance.